Pratt &Whitney SwiftPac Power plant consisting of: • 3 Pratt & Whitney Power Systems 60 MW FT8-3 SwiftPac dual fuel (gas/diesel) turbine packages • 2 x water treatment facilities for demineralization of injection water (water is injected to • reduce NOx-emissions from 176 ppm to 25 ppm/diesel: to 42 ppm) • Step up transformer 11,5/132 kV 160 MVA • Switchgear 11.5 kV / auxiliary equipment



Learn More


Click Here>>>> CTG~GT2F-0416 3 X Switfpac 60 Power Plant Offering_05-22.pdf


History:

In response to an energy deficit in the region several years ago, company had established two reserve power plants. The plant was never called into service. A new transmission line finalized in 2016 solved the energy deficit. The need for reserve power is no longer present. Company has decommissioned the plants and CTG is now initiating a sales process on behalf of the ownership. The plant is in excellent functional  and physical condition.

Scope of  Supply:


Pratt &Whitney SwiftPac Power plant consisting of:


  • 3 Pratt & Whitney Power Systems 60 MW FT8-3 SwiftPac dual fuel (gas/diesel) turbine packages
  • 2 x water treatment facilities for demineralization of injection water (water is injected to
  • reduce NOx-emissions from 176 ppm to 25 ppm/diesel: to 42 ppm)
  • Step up transformer 11,5/132 kV 160 MVA
  • Switchgear 11.5 kV / auxiliary equipment


The Plant was delivered and maintained by PW Power Systems (PWPS - formerly Pratt & Whitney ®) a subsidiary of Mitsubishi Heavy Industries Ltd. (MHI), and had provided emergency power capacity since 2008, but had only operated for less than four hundred hours - for maintenance purposes – only. 

Reference Addendum A